Excavation Calculator

Soil to dig out for a foundation, pond or trench: in-ground volume, loose volume after swell, truckloads or skips, weight and removal cost.

Units (optional)
Shape of the area (optional)

Feet or metres.

Cubic yards or cubic metres of loose material per load.

Optional. For hauling or skip hire.

About the Excavation Calculator

Every foundation, basement, pond, pool, driveway and drainage trench starts with a hole, and every hole produces a pile of spoil that has to go somewhere. The volume of the hole is simple geometry. The volume of the pile is not the same number: soil that has been dug up breaks into lumps with air between them and takes up noticeably more space than it did in the ground.

This excavation calculator gives both. It works out the in-ground (bank) volume from the size and depth of the dig, applies a typical swell factor for the soil type to give the loose volume you will actually haul, and turns that into the number of truckloads or skips. It also estimates the weight, because a truck can reach its weight limit before it is full, and an optional removal cost.

How to Use the Excavation Calculator

Choose feet or metres. Unlike the landscaping calculators, the depth here is in feet or metres, because excavations are measured that way.

Pick the shape: a rectangle for most foundations and trenches, or a circle for a round pond or pit.

Enter the length and width, or the diameter, and the depth.

Choose the soil type. Sand, loam, clay and rock swell by very different amounts.

Enter the capacity of one truck or skip in cubic yards or cubic metres.

Optionally, enter the price per load for hauling or skip hire.

How Excavation Volume Is Worked Out

  bank volume   =  length × width × depth       (or π × d² ÷ 4 × depth)
  loose volume  =  bank volume × (1 + swell %)
  loads         =  loose volume ÷ capacity, rounded up
  weight        =  bank volume × in-ground density

The weight uses the bank volume and the in-ground density. Digging adds air, not mass, so the weight does not change when the soil swells.

Step-by-Step Example

A basement dig 20 by 15 feet and 3 feet deep in clay, 10 yd³ trucks at 300 a load.

  Bank volume:   20 × 15 × 3            =  900 ft³  = 33.33 yd³
  Swell:         33.33 × 1.35           =  45.00 yd³ loose
  Loads:         45.00 ÷ 10             =  4.5  → 5 loads
  Weight:        25.49 m³ × 1.9 t/m³    =  48.4 t   ≈ 53.4 US tons
  Cost:          5 × 300                =  1,500.00

In metric, a hole 6 by 4 metres and 1 metre deep in loam is 24 m³ in the ground and 30 m³ loose, which fills five 6 m³ skips.

Typical Swell Factors

SoilSwellIn-ground density
Sand or gravelabout 12%about 1.7 t/m³
Loam or topsoilabout 25%about 1.6 t/m³
Clayabout 35%about 1.9 t/m³
Broken rockabout 60%about 2.5 t/m³

These are typical planning figures. Wet soil is heavier, stony soil swells more, and the actual numbers on your site can differ, so treat the result as an estimate and allow some margin when booking trucks.

Volume Limits and Weight Limits

A dump truck or skip has two limits: how much it holds and how much it is allowed to carry. With light, fluffy soil the volume runs out first. With wet clay or rock, a truck can hit its legal weight limit while it still looks half empty.

That is why the calculator shows the weight each load would carry. Check it against the limit your haulier or skip company gives you. If it is too high, you need more, smaller loads, and the cost goes up accordingly.

Planning a Dig Safely

Locate buried services before any digging: gas, water, electricity and telecoms cables can all be close to the surface.

Support deep trenches. Trenches deeper than about 4 feet, or 1.2 metres, generally need shoring, a trench box or sloped (battered) sides to stop them collapsing. Sloping the sides increases the volume, so add it to your figures.

Plan where the spoil goes. Keep piles well back from the edge of the excavation, and decide early whether any topsoil will be kept for landscaping.

Follow local rules and get professional advice for anything deep, close to a building or near a boundary.

Keeping Topsoil Separate

On many sites the top few inches of soil are worth keeping. Topsoil is expensive to buy back, and it is the layer plants need.

Strip it first. Scrape off the topsoil across the whole area and stockpile it separately before digging deeper.

Measure it as its own layer. Run the calculator once for the topsoil depth and once for the subsoil below, so you know how much will stay on site and how much has to go.

Keep the heap small and loose. Large, compacted heaps of topsoil lose their structure. Keep them no higher than about 6 feet, or 2 metres, and away from traffic.

Understanding Your Result

Volume to dig out is the bank volume, the size of the hole.

Loose volume is what the spoil will occupy once dug, after swell.

Loads is the number of trucks or skips, with the weight each would carry.

Weight is the total weight of material removed.

Area and depth confirms the dimensions used.

Cost multiplies the loads by your price per load.

Worth knowing reminds you about weight limits and trench support.

When Should You Use This Calculator?

Pricing a foundation or basement dig.

Booking skips or trucks for spoil removal.

Digging a pond or pool.

Trenching for drainage or services.

Comparing quotes from excavation contractors.

Common Mistakes

Ordering trucks for the bank volume. The loose volume is 12–60% bigger.

Ignoring weight. Wet clay and rock can overload a truck that looks half full.

Forgetting sloped sides. Battered trench walls add to the volume dug.

Using one swell factor for everything. Rock swells about five times as much as sand.

Not checking for services before breaking ground.

Frequently Asked Questions

How do I calculate excavation volume?

Multiply length by width by depth for the volume in the ground. A hole 20 by 15 feet and 3 feet deep is 900 cubic feet, or 33.33 cubic yards. Then add the swell factor to get the volume of loose spoil you will actually have to move.

What is the swell factor of soil?

The increase in volume when soil is dug up and loosened. Typical figures are about 12 percent for sand and gravel, 25 percent for loam, 35 percent for clay and 60 percent for broken rock. So 33.33 cubic yards of clay in the ground becomes about 45 cubic yards in the truck.

How many truckloads will I need?

Divide the loose volume by the capacity of one truck or skip and round up. 45 cubic yards of loose clay in 10 cubic yard trucks is 4.5, so five loads. Check the weight too: a truck can reach its legal weight limit before it is full.

How much does a cubic yard of dirt weigh?

In the ground, loam weighs about 1.6 tonnes per cubic metre, or roughly 2,700 pounds per cubic yard. Clay is heavier at about 1.9 tonnes per cubic metre, and rock around 2.5. Wet soil is heavier than dry.

Why is loose soil lighter per yard but more yards?

Digging adds air between the lumps. The weight stays the same but it is spread over more volume, so each loose cubic yard weighs less than a cubic yard in the ground, while the number of yards to haul goes up by the swell.

Do deep trenches need anything extra?

Yes. Trenches deeper than about 4 feet, or 1.2 metres, generally need shoring or sloped, battered sides to stop them collapsing, and sloping the sides increases the volume dug. Follow local safety rules and get professional advice for deep excavations.

Last reviewed September 28, 2026 by the CalculatorPeak editorial team.